LGE Design Build recently completed construction on a newly remodeled office, manufacturing and warehouse facility located in Tempe, AZ for Cling’s. This 39,963 SF facility includes a new 6,175 SF office area, and a fully air conditioned 27,688 SF manufacturing area with an ancillary 6,100 SF evap-cooled storage area. The original office area was updated with all new exterior, including an entrance plaza, steel canopies, lighting and landscaping. The interiors are contemporary, with carpet tile, accented walls and epoxy floors in those areas with heavy employee traffic. The air conditioned manufacturing area insures the exceptional standards and tolerances of their manufacturing can be maintained consistently. Cling’s Aerospace was established in 1972. They are established as a high quality contract manufacturer for the aerospace, defense and medical industries. Their specialties are in complex, 4 and 5 axis machined parts, fabricated tubes, weldments and assemblies.
2013-09-24T09:42:38-07:00
LGE: Cling Manufacturing Headquarters Construction Complete
Related Posts
-
How AI is changing construction from classroom to jobsite - Read Article How AI is changing construction from classroom to jobsite
2026-10-11T07:30:00-07:00
-
Why Arizona contractors should budget for traffic control before breaking ground - Read Article Why Arizona contractors should budget for traffic control before breaking ground
2026-10-07T07:35:00-07:00
-
How jobsite storage containers help contractors control cost and site risk - Read Article How jobsite storage containers help contractors control cost and site risk
2026-10-02T07:25:00-07:00