NAIOP-AZ Projects Criteria:
• Property must be owned or have non-refundable earnest money in escrow by 8/1/14
• Property must have proper zoning in place by 8/1/14
• Property must be bigger than 100KSF


[SlideDeck2 id=106022]

1. 10 West Logistics Center
Developer:
Wentworth Property Company
General Contractor:
Graycor
Architect:
Butler Design Group, Inc.
Location:
6200 W. Van Buren St., Phoenix
Size:
660KSF
Start/Completion:
Summer 2014
Highlights:
10 West Logistics Center is an 80-acre, Class-A masterplanned bulk distribution business park. The high-image facilities offer 36-foot clearance, ESFR sprinklers, energy efficient motion sensor lighting, dock-high loading and trailer and car parking.

2. American Furniture Warehouse — Glendale
Developer:
American Furniture Warehouse
General Contractor:
D.L. Withers
Architect:
Butler Design Group, Inc.
Location:
SEC 99th Ave. and Bethany Home road, Glendale, Ariz.
Size:
600KSF
Value:
$25M
Start/Completion:
March to August 2014
Highlights:
Located on the east side of 99th Avenue at the southeast corner of 99th Avenue and Bethany Home Road, American Furniture Warehouse (AFW) is a single-tenant retail development that supports the City of Glendale’s desire for high quality retail in the area. The one-story building is approximately 534KSF on 36 acres of land fronting on 99th Avenue. The building will consist of approximately 152KSF of showroom, 382KSF of warehouse space and 60KSF of mezzanine within the warehouse area.

3. Amkor Corporate Headquarters
Developer:
Ryan Companies US, Inc.
General Contractor:
Ryan Companies US, Inc.
Architect:
PHArchitecture
Location:
Tempe, Ariz. (ASU Research Park)
Size:
101,949 SF
Brokerage Firms:
Cassidy Turley (Ryan Cos.) and CBRE (Amkor)
Start/Completion:
March 2014 to est. January 2015
Subcontractors:
Suntec Concrete, Ace Asphalt, Delta Diversified, Saguaro Steel
Highlights:
This is the new 101,949 SF corporate headquarters for Amkor Technology, Inc., featuring an open office concept for approximately 350 employees with large training and conference areas.

4. Aspera
Developer:
Cardon Development Group
General Contractor:
TBD
Architect:
Butler Design Group, Inc.
Location:
NWC 75th Ave. and Loop 101, Glendale, Ariz.
Size:
83KSF
Start date:
September 2014
Highlights:
The commercial retail parcels are a collection of eight single story buildings comprised of four pad sites, three shop buildings anchored by a single 39KSF Mountainside Fitness (Cardon Development Group, Ryan Companies, Butler Design Group, $5M, September 2014 to February 2015) on less than 17 acres.

5. AZ 202 Commerce Park
Developer:
ViaWest Group
General Contractor:
TBD
Architect:
Ware Malcomb
Location:
Arizona Avenue & 202 Loop
Size:
260,600 SF
Brokerage Firm:
Cassidy Turley
Value:
$20M
Start/Completion:
November 2014 to May 2015
Subcontractors:
TBD
Highlights:
Two industrial buildings comprised of 139KSF and 122KSF grade level and dock-high loading and 28- to 30-foot clear heights. The property is one turn to diamond interchange at Arizona Avenue and the Loop 202 freeway.

6. Centrica
Developer:
Phoenix Rising Investments
General Contractor:
Willmeng Construction
Architect:
Nelsen Partners
Location:
1550 W. Southern Ave., Mesa, Ariz.
Size:
140,000 SF
Brokerage Firm:
Cushman & Wakefield of Arizona
Completion date:
November 2014
Highlights:
The adaptive re-use development will turn three shuttered, big-box retail stores into a Class-A office building expandable to 140KSF. Its location in the Fiesta District and a robust fiber optic infrastructure make Centrica ideal for tech companies seeking a headquarters or office space.

7. Coldwater Depot III
Developer:
Trammell Crow Company
General Contractor:
D.L. Withers Construction
Architect:
Butler Design Group, Inc.
Location:
Avondale, Ariz. (NEC 127th Avenue and Van Buren Street)
Size:
187KSF
Brokerage Firm:
CBRE
Value:
$10M
Start/Completion:
Nov. 1 2014 to April 30 2015
Highlights:
Coldwater Depot Logistics Center Phase III is the final phase of a three building master plan developed by Trammell Crow Company and Clarion Partners. The previous two phases were sold in Q42013 to Lake Washington Partners. The 11-acre site, located just south of the Interstate 10 Freeway in Avondale, Ariz., will feature one 187KSF, Class-A distribution building.

8. GoDaddy Global Technology Center
Developer:
Ryan Companies US, Inc.
General Contractor:
Ryan Companies US, Inc.
Architect:
PHArchitecture (shell); SmithGroupJJR (interiors)
Location:
Tempe, Ariz. (ASU Research Park)
Size:
150KSF
Brokerage Firm:
Cassidy Turley (Ryan Cos.); CBRE (GoDaddy)
Value:
$30M
Start/Completion:
September 2013 to est. September 2014
Subcontractors:
Gunsite Construction Corp., Suntec Concrete, Carlson Glass Inc., JD Sun Mechanical, Berg Drywall
Highlights:
This 150KSF, two-story facility providing creative space for 1,300 employees, including engineers, developers and customer-care representatives.

9. Kyrene 202 Business Park – Phase I
Developer:
EastGroup Properties, Inc.
General Contractor:
The Renaissance Companies
Architect:
Butler Design Group, Inc.
Location:
200 S. Kyrene Road, Chandler, Ariz.
Size:
120KSF
Brokerage Firm:
Colliers International
Highlights:
Kyrene 202 Business Park is a six building, front-park, rear-load business park designed to attract customers needing a minimum of 8KSF up to 122KSF. The project will contain state-of-the-art features such as 24-to 30-foot clear heights, ESFR sprinkler systems, T-5 warehouse lighting and a parking ratio in excess of two per thousand square feet. Phase I, consisting of 119,933 SF, is currently under construction with an estimated completion during September 2014 and Phases II and III, totaling 285,800 SF, will be constructed in 2015.

10. Living Spaces Furniture Showroom and Distribution Center
Developer:
Irwin Pasternack
General Contractor:
Ryan Companies US, Inc.
Architect:
Irwin G. Pasternack, AIA & Associates
Location:
Phoenix
Size:
437,234 SF
Value:
$14M
Start/Completion:
April 2013 to February 2014
Subcontractors:
Hard Rock Concrete, Ace Asphalt, JB Sun Mechanical, Chas Roberts
Highlights:
This 437,234 SF showroom and distribution facility, includes 314,384 SF of warehouse and distribution space, a 122,850 SF showroom, and a receiving dock with 35 truck bays. Ryan also built the surrounding infrastructure, including roads and traffic signals.

11. Mach One — Chandler Airport Center
Developer:
Trammell Crow Company
General Contractor:
TBD
Architect:
Butler Design Group, Inc.
Location:
NWC Cooper & Germann Roads, Chandler, Ariz.
Size:
200KSF
Value:
$5.388M
Start/Completion:
2Q to 4Q 2015
Brokerage Firm:
Colliers International
Highlights:
This spec office space within the Chandler Airport Center is comprised of two, 100KSF two-story buildings.

12. Parc 17
Developer:
Jackson Shaw Company & LaPour Cos
General Contractor:
Nitti-Graycor
Architect:
McCall & Associates
Location:
NWC 7th Ave & I-17
Size:
177,750 SF
Brokerage Firm:
Lee & Associates
Value:
$14M
Start/Completion:
November 2014 to May 2015
Highlights:
Parc 17 is a Class-A industrial development fronting Interstate 17 less than three miles from Sky Harbor Airport. Parc 17 offers a 101,290 SF multi-tenant industrial building with dock high, grade level loading options as well as ownership opportunities featuring over-standard secure storage yards and dock high loading capabilities sized from 31,862 or 44,592 SF. All buildings are constructed to a 28-foot foot clear height and equipped with ESFR sprinkler systems.

13. Park Lucero
Developer:
Trammell Crow Company
General Contractor:
D.L. Withers Construction
Architect:
Butler Design Group, Inc.
Location:
Gilbert, Ariz.
Size:
631KSF
Brokerage Firm:
JLL
Value:
$46M
Start/Completion:
Aug. 1 2014 to March 1 2015
Highlights:
Park Lucero is a new Class-A industrial development located along the south Loop 202 Freeway developed by Trammell Crow Company and Artis REIT. This ±48.3 acre project features six buildings totaling 631KSF. It’s one of the newest and largest developments in the Southeast Valley of its kind.

14. Playa del Norte
Developer:
Irgens Partners
General Contractor:
TBD
Architect:
WorksBureau
Location:
979 E. Playa del Norte Dr., Tempe, Ariz.
Size:
103KSF
Brokerage Firm:
Cushman & Wakefield of Arizona
Start/Completion:
TBD
Highlights:
Playa del Norte is a nine-story, 103KF build-to-suit, Class-A office building in Tempe. It offers convenient access to the Southeast and Northeast valleys, Sky Harbor International Airport and the 101 and 202 freeways.

15. Portico Place II
Developer:
Irgens
General Contractor:
TBD
Architect:
Archicon
Location:
2195 W. Chandler Blvd. Chandler, Ariz.
Size:
49,175 SF
Brokerage Firm:
Lee & Associates
Value:
TBD
Start/Completion:
September 2014 to March 2015
Highlights:
Portico Place II is a 49KSF, two-story, Class-A multi-tenant office building breaking ground in fall 2014. With modern design amenities, energy efficient construction, and large 25KSF floor plates, Portico Place II will be the premier Class-A office building in Chandler for corporate users. Located just off Chandler Boulevard and Dobson Road, the property provides prospective tenants a highly visible and accessible location. Portico Place II enjoys a retail-type presence with many desirable amenities within a one-mile radius including Chandler Fashion Square Mall. In addition to being less than one mile from the Chandler Regional Hospital, the project is in close proximity to major employers such as Intel, Microchip, Bank of America and Orbital Science.

16. Reserve at San Tan – Phase II
Developer:
Orsett Properties
General Contractor:
Willmeng Construction
Architect:
Butler Design Group, Inc.
Location:
339 E. Germann Rd., Gilbert, Ariz.
Size:
104,425 SF
Brokerage Firm:
Newmark Grubb Knight Frank
Value:
WND
Estimated completion:
December 2014
Highlights:
Phase II of the Reserve at San Tan includes construction of Building No. 4, a single-story office building with multiple options for tenancy, including mezzanine or second floor capabilities. The Reserve is a 39-acre, Class-A business park.

17. Rivulon 1 & 2
Developer:
Nationwide Realty Investors
General Contractor:
TBD
Architect:
Butler Design Group, Inc.
Location:
NEC of Gilbert Road and San Tan Freeway, Gilbert, Ariz.
Size:
150KSF; 125KSF
Brokerage Firm:
Lee & Associates
Start/Completion:
4Q 2014 to 4Q 2015
Highlights:
Rivulon 1 is a three-story build-to-suit building for Isagenix. Rivulon 2 is a four-story speculative office building. Both projects will be submitted for LEED Certification.

18. Scottsdale Quarter III, Block M

Developer:
Glimcher Realty Trust
General Contractor:
IBEX Construction
Architect:
Nelsen Partners
Location:
15059 N. Scottsdale Rd., Scottsdale, Ariz.
Size:
±170KSF
Brokerage Firm:
CBRE
Value:
WND
Start/Completion:
Summer 2014 to summer 2015
Highlights:
Scottsdale Quarter is the premier mixed-use project in Greater Phoenix, located on 28 acres at the southeast corner of Scottsdale Road and Greenway-Hayden Loop. At complete build-out, Scottsdale Quarter will include more than 1MSF of office, retail, residential and hotel space. The dozens of restaurants and shops on-site offer an unmatched walkable amenity base in the heart of upscale Scottsdale. Phase III will add another 140KSF of Class-A office space.

19. SkySong III
Developer:
The Plaza Companies
General Contractor:
DPR Construction
Architect:
Butler Design Group, Inc.
Location:
1365 N. Scottsdale Rd., Scottsdale, Ariz.
Size:
148,960 SF
Brokerage Firm:
Lee & Associates
Value:
$12M
Start/Completion:
August 2014
Highlights:
This a four-story multi-tenant office building more than 80 percent leased. This project has been submitted for LEED Silver certification.

20. SkySong IV
Developer:
The Plaza Companies
General Contractor:
DPR Construction
Architect:
Butler Design Group, Inc.
Location:
1355 N. Scottsdale Rd., Scottsdale, Ariz.
Size:
150KSF
Brokerage Firm:
Lee & Associates
Start/Completion:
October 2014 to August 2015
Highlights:
This is a four-story multi-tenant office building. This project will be submitted for LEED certification.

21. Spectrum Ridge
Developer:
Trammell Crow Company
General Contractor:
TBD
Architect:
Butler Design Group
Location:
Phoenix
Size:
220KSF
Brokerage Firm:
CBRE
Value:
$19M
Start/Completion:
Aug. 15 2014 to March 1 2015
Highlights:
Spectrum Ridge is a Class-A industrial development located in the Deer Valley submarket on 7th Street, one mile north of the Loop 101 Freeway, developed by Trammell Crow Company and Principal Real Estate Investors. This ±14.4-acre project features three buildings totaling 220KSF.

22. Tolleson Corporate Park, Building E
Developer:
Merit Partners, Inc.
General Contractor:
The Renaissance Companies
Architect:
Butler Design Group, Inc.
Location:
777 N. 79th Ave., Tolleson, Ariz.
Size:
580KSF
Start/Completion:
2015
Highlights:
This is a single-story industrial build-to-suit project.

23. Westech
Developer:
Seefried Properties
General Contractor:
TBD
Architect:
Butler Design Group, Inc.
Location:
300 E. Palomino Dr., Chandler, Ariz.
Size:
126,360 SF
Start/Completion:
TBD
Highlights:
Westech proposed 126,360 SF single-user speculative industrial/manufacturing building. Truck loading and receiving located on the east side of the building with cross-dock capability on the west side. The north side of property is planned for outside storage or building expansion.

24. WL Gore & Associates Manufacturing, Building 3, Phase II
Developer:
W.L. Gore & Associates
General Contractor:
Ryan Companies US, Inc.
Architect:
Reece Angell Rowe Architects
Location:
Phoenix
Size:
132,900 SF
Value:
$35M
Start/Completion:
June 2012 to December 2013
Subcontractors:
University Mechanical, Kearney Electric, Metal Weld, Baker Concrete, Berg Drywall, KT FAB
Highlights:
This 132,900 SF facility includes office, warehouse and clean rooms spaces. A walkable ceiling above the clean rooms allows workers to change out light bulbs and air filters without interrupting production. An exercise room, kitchen area and volleyball courts help to promote employee wellness.