NAIOP Member Projects 2011
ASU Nursing and Health Innovation Phase II
Owner: City of Phoenix
Contractor: DPR Construction
Architect: SmithGroup
Location: 550 N. 3rd St., Phoenix
Size: 84,000
The $29.25M NIH facility contains classrooms, office and administrative spaces, a 300-seat conference center and a 60-seat computer classroom lab. Sustainable features include solar water heating and demand-controlled ventilation.
AZ 202
Developer: Meridian West
Contractor: TBD
Architect: Butler Design Group
Broker: Lee & Associates
Location: NWC Loop 202 and Arizona Ave, Chandler
Size: 432,758 SF
Completion: TBD
AZ 202 is a mixed-use project in the Southeast Valley that will serve as the entrance to Downtown Chandler. It features two Class A office buildings (4 and 6 stories), a hotel, retail shops, restaurants and other high visibility pads.
Boart Longyear
Developer: ViaWest Properties, LLC
Contractor: LGE Corporation
Architect: Cawley Architects
Broker: Cassidy Turley BRE Commercial
Location: SWC of 71st Ave. and Augusta Ave., Glendale
Size: 19,841 SF
Completion: 1Q 2012
The $3.2M project is a new-build a commercial warehouse for Boart Longyear, an international, Australian-based manufacturer of drill mining products and services.
CityScape
Developer: RED Development
Contractor: Hunt Construction
Architect: Callison
Location: One E. Washington, Phoenix
Size: 1.1 MSF
Completion: 3Q 2010
CityScape is $900M, mixed-use urban project in Downtown Phoenix. It includes 600,000 SF of Class A office, 180,000 SF of retail, 50,000 SF of park/open space and a 240-room, 4-star Kimpton Palomar boutique hotel.
DIRTT Environmental Solutions
Developer: EastGroup Properties, Inc.
Contractor: McShane Construction Company
Architect: Butler Design Group and Phoenix Design One
Location: 83 E. University Dr., Phoenix
Size: 72,000 SF
Completion: 3Q 2011
The $3M project consists of 67,000 SF of manufacturing and 5,000 SF of office. It offers 28 feet clear height, 10 external docks and two drive-in doors. McShane will adhere to construction waste recycling and the integration of environmentally friendly products throughout.
DPR Construction Phoenix Regional Office
Owner: DPR Construction
Contractor: DPR Construction
Architect: SmithGroup
Location: 44th and Van Buren, Phoenix
Size: 16,000 SF
Completion: 4Q 2011
DPR’s new Phoenix office is in the city’s Discovery Triangle corridor and signals the revitalization of a long-dilapidated building. Dubbed the DPR Boutique, it serves as an example of how sustainable design can be integrated into an efficient, effective and environmentally responsible office space.
Fajon Machining
Developer: Power Equipment LLC
Contractor: Sun State Builders
Architect: e project
Location: 2305 E. Jefferson, Phoenix
Size: 16,580 SF
Completion: 2Q 2011
The new, $1.6M fully air-conditioned machine is a machine shop for rebuilding turbines, utilizing a pre-engineered metal building structure with metal roof panels, and walls with a combination of metal walls panels and split-faced masonry block.
Fountainhead Office Plaza — 7C
Owner: US Real Estate Limited Partnership
Developer: Metro Commercial Properties
Pre-construction services: Sundt Construction
Architect: Davis
Location: 1650 W. Alameda, Tempe
Size: 384,300 SF
A new, 14-story office tower and 7-story parking structure are planned for the 6-acre site fronting I-10 in Tempe. It will be just south of Fountainhead Office Plaza A and B, which were completed in 3Q 2011.
Gap Fulfillment Center
Developer: N/A
Contractor: Jokake Construction
Architect: K&I Architects
Broker: Cushman & Wakefield
Location: 2225 S. 75th Ave., Phoenix
Size: 412,000 SF
Completion: 2Q 2011
Gap’s new west Phoenix distribution center is a technologically advanced facility, featuring a robotic handling system for product fulfillment. The project was broken down into three distinct phases in an effort to meet the tenant’s operation and integration deliverables.
Jones Lang LaSalle Design/Build Business Parks
Project: Avondale Commerce Park
Developer: Valley Land Investors
Contractor: Rockefeller
Location: 101st Ave. and Van Buren Rd., Tolleson
Size: 80 acres
Project: Buckeye Industrial Rail Park
Developer: Globe Corporation
Contractor: Ryan Companies US
Location: SEC Watson Rd. and Southern Ave., Buckeye
Size: 260 acres
Project: Phoenix Central Logistics Center
Developer: Stravinski
Location: 39th Ave. and Gibson, Phoenix
Size: 40 acres
Project: Phoenix Logistics Center
Developer: McShane Development Co.
Contractor: McShane
Location: SEC 91st Ave. and Buckeye Rd., Phoenix
Size: 100,000 to 2.5 MSF
Project: Surprise Pointe
Developer: ESI Ventures
Location: Waddell Rd. and Dysart Rd., Surprise
Size: 154 acres
Project: Westech Business Center
Developer: Seefried Properties, Inc.
Location: SEC Elliott Rd. and Arizona Ave., Chandler
Size: 9 acres expandable to 27.39 acres
La Loma Medical Plaza Phase II
Developer: BLC Development
Contractor: Sigma Contracting
Architect: Devenney Group Architects
Broker: Colliers International
Location: 14044 W. Camelback Rd., Litchfield Park
Size: 40,000 SF
Completion: 4Q 2011
The project is a $6M, Class A medical building for lease on the site of a 350-acre campus of healthcare services and residential wellness villages. It is in close proximity to the Banner Estrella Hospital, the West Valley Hospital, and the new Cancer Treatment Centers of America.
Lakeside Medical Commons
Developer: Irgens Health Care Facilities Group
Contractor: TBD
Architect: Patrick Hayes Architects
Location: 979 N. Playa del Norte, Tempe
Size: 48,000 SF
Completion: 4Q 2012
The $14M Class A medical office building with sustainable design will serve as a signature off-campus location for healthcare providers. The building will offer 25,000 SF floor plates for larger practices/clinics divisible to be 1,500 SF.
Litchfield Park Commons
Developer: Don Bennett Partners
Contractor: Homes & Son Construction
Architect: MRT Design
Location: 200 W. Wigwam Blvd., Litchfield
Size: 47,500 SF
Completion: TBD
The project calls for a $10M, 2-story, multi-use (office, retail and restaurant) facility in Downtown Litchfield Park. Shady outdoors plazas will integrate with the expanded city hall; balconies will echo the nearby historic Wigwam Resort with modern flair.
Mountain Ranch Medical Commons
Developer: Irgens Health Care Facilities Group
Contractor: TBD
Architect: TBD
Broker: CB Richard Ellis
Location: Estrella Parkway and Elliot Rd., Goodyear
Size: 24,500 SF
Completion: 3Q 2012
With no existing medical services in Estrella, this new, $6M single-story Class A office building will be the community’s first medical office project. It offers space available from 1,200 SF to 24,500 SF with no-use restrictions.
Phoenix Biomedical Research Center
Owner: City of Phoenix
Developer: Boyer Co./Hahn/Spiekerman Development Group
Contractor: DPR
Architect: SmithGroup
Broker: Cassidy Turley BRE Commercial
Location: Phoenix Biomedical Campus, NEC 5th and Van Buren Rd.
Size: 155,000 SF
Completion: 1Q 2014
Utah-based Boyer Co. plans to develop a $50M, 6-story biomedical research facility in Downtown Phoenix. The building’s design features include a central plant to provide a “single-pass air” HVAC environment, beefed-up floor loading which will allow “wet lab” benching and a state-of-the-art energy management system.
Phoenix GSA Professional Office Building
Developer: Ryan Companies US
Contractor: Ryan Companies US
Architect: AECOM
Location: 21711 N. 7th St., Phoenix
Size: 223,000 SF
Completion: 4Q 2011
The $47M development is a build-to-suit, 5-story building that will serve as a multi-purpose facility for the Phoenix office of the FBI. It sits on 12.3 acres and includes structured and on-grade parking for 557 vehicles.
Paradiso
Developer: Mark IV Capital, Inc.
Contractor: Build Strategic, Inc.
Architect: Lamb Architects
Broker: Cassidy Turley BRE Commercial
Location: 11000 N. Scottsdale Rd., Scottsdale
Size: 59,502 RSF
Completion: 3Q 2011
The $18M medical project includes architecture, eenhancements, a modern paint scheme, lush landscaping, a courtyard, new signage and redesigned tenant spaces.
Salvation Army Divisional Headquarters
Development manager: Jones Lang LaSalle
Contractor: Nitti Graycor
Architect: Deutsch Architecture Group
Location: 27th St. and Van Buren Rd., Phoenix
Size: HQ 40,000 SF; Social Services 35,000 SF
Broker: Jones Lang LaSalle
Completion: 2Q 2012
The $10M project on the Herberger Campus will include a social services headquarters for outreach (including a new homeless shelter), domestic abuse facility, senior housing, Christmas Angel program and church. The other is the Southwest Divisional Headquarters with all of the corporate staff.
Sky Harbor Towers
Developer: Bedford Properties and Apollo
Contractor: D.L. Withers and Sundt Construction
Architect: GSAS
Broker: Colliers International
Location: 4605, 4615 and 4635 E. Elwood St., Phoenix
Size: 273,623 SF
Sky Harbor Towers consists of three, Class A buildings in an office
campus setting along I-10 and SR 143 (Hohokam Expressway).
WL Gore Pinnacle Peak Campus
Developer: WL Gore
Contractor: Ryan Companies US
Architect: Reece-Angel-Rowe Architects
Location: N. North Valley Parkway and Bronco Butte Trail, Phoenix
Size: 230,000 SF Phase 1
The $76M project is the first phase of WL Gore’s Pinnacle Peak Biomedical campus. Each of the first two buildings contain 111,000 SF and include sterilization labs and R&D labs. Phase 1 also includes a 420-stall parking structure.