From a 6,500-square-foot restaurant and retail addition that will enhance the already popular Park Central development in Central Phoenix to multimillion-square-foot industrial parks along the Loop 303, commercial real estate showed no signs of slowing down during the pandemic. In fact, NAIOP Arizona members were busier than ever delivering an abundance of high-tech, high-style product to the market — with many more show-stopping buildings under construction or renovation. The following story showcase 32 projects, small and large, that NAIOP Arizona members are producing throughout Arizona.
READ ALSO: 14 deals top $100M to lead biggest Metro Phoenix deals of summer
10 West Commerce Park
Developer: Creation
General Contractor: LGE Design Build
Architect: LGE Design Group
Location: Lower Buckeye and Miller roads, Buckeye
Size: 958,382 SF
Value: $37.4 million
Start/Completion: Q1/2021-Q2/2022
Subcontractors: Suntec Concrete, Stoll Masonry, Rikoshea Contracting, Specialty Roofing, Valley Exterior Painting
Project Description: This best-in-class industrial product meets the market’s demand for functional, flexible cross-dock distribution solutions. Careful consideration was given to circulation, maneuverability and building design, with special attention paid to critical features, such as clear height, loading configuration and enhanced parking/yard availability.
2625 at Chandler Freeway Crossing
Developer: Mark IV Capital
General Contractor: Venn Construction
Architect: Balmer Architectural Group
Location: 2625 W. Geronimo Place, Chandler
Size: 159,030 SF
Brokerage Firm: JLL
Value: $34 million
Start/Completion: 1/2018-3/2021
Subcontractors: Ace Acoustics, Adobe Drywall and Paint, Arcadia Glass Company, Beach Products, Bernie’s Brass, CDS Framing, Contemporary Flooring, Den-Mark, Desert Services, Desert Sky Surfaces, Diversified Interiors, Gen3, Hawkeye, Hersey, Aerni & Associates, Intertwine, J&M Glass, JD Sun, Kone, LaForce, Magnum Steel, McKeon, Mister Bugman, Nickle Contracting, Noding Doors, One Way Final Cleaning, RCI Systems, Re-Create, Rite-Way, Ryan Mechanical, Special Electronics Systems, Southwest, Suntec Concrete, Westar, Won-Door.
Project Description: This three-story Class A office features 50,790-square-foot floor plates, high 14-foot ceilings and a collaborative 10,000-square-foot VIP roof deck for private tenant use.
4141 Scottsdale
Developer: Mass Equities
Architect: Krause
Location: 4141 N. Scottsdale Road, Scottsdale
Size: 160,000 SF
Brokerage Firm: Cushman & Wakefield
Value: $17 million
Start/Completion: Q1/2021-Q1/2023
Subcontractors: Caruso Turley Scott, MP+E, Greey|Pickett, Larson Design Group
Project Description: Looking toward the future with a modern design, this project will provide a new anchor to the city where it pursues the region’s passion for place, nature, history, craft and the future — five attitudes essential to the design’s core. This renovation will replace the existing brick facade with new contemporary glazing. A grand three-story atrium volume for the main entrance will unite the two separate buildings. The interiors will also be upgraded, with new signage and wayfinding throughout. The final product will add 15,426 square feet of new leasable area.
999 Playa del Norte
Developer: Irgens Partners
General Contractor: A.R. Mays
Architect: WORKSBUREAU
Location: 999 Playa del Norte, Tempe
Size: 94,311 SF
Brokerage Firm: Lee & Associates
Start/Completion: 02/2020-04/2021
Project Description: Playa, which sits on 2.32 acres of land next to Tempe Town Lake, is Tempe’s newest technology-centric, high-profile Class A office building. The six-story structure, which comprises a lobby level, two stories of structured parking and three floors of office with impressive visibility, is ideally positioned at the gateway to ASU’s main campus with a full-diamond freeway interchange at Scottsdale Road and Loop 202.
Airport 48
Developer: ViaWest Group
General Contractor: Stevens-Leinweber
Architect: McCall & Associates
Location: 3232 S. 48th St., Phoenix
Size: 146,526 SF
Brokerage Firm: NAI Horizon
Start/Completion: 10/2021-Q3/2022
Project Description: This Class A multitentant industrial building will sit on a rectangular-shaped 9.98-acre parcel located south of Sky Harbor Airport. The property is within a Federal Qualifed Opportunity Zone and is extremely well-situated with visibility and access to State Route 143.
Airpark Logistics Center
Developer: Creation
General Contractor: LGE Design Build
Architect: LGE Design Group
Location: Bullard Avenue and Yuma Road
Size: 2,741,336 SF
Value: $155 million
Start/Completion: Q4/2021-Q2/2025
Subcontractors: Suntec Concrete, Triad Steel, Desert Structures, New Millenium, Phoenix Commercial Electric
Project Description: Airpark Logistics Center, located in a federally approved Foreign Trade Zone, will consist of 2.7 million square feet of industrial space upon full build out, meeting the market’s demand for both cross-dock and rear-load product. Constructed in two phases, with special attention paid to clear height, loading configuration and enhanced parking/yard availability.
Allred Park Place
Buildings 7 & 8
Developer: Douglas Allred Company
General Contractor: Willmeng Construction
Architect: Balmer Architects
Location: 1375/1475 S. Price Rd., Chandler
Size: 300,000 SF
Brokerage Firm: Cushman & Wakefield
Value: $110 million
Start/Completion: 5/2020-9/2021
Subcontractors: Bowman Engineering, Coreslab, Hardrock Concrete, Hawkeye Electric, Apache Pipelines, Milam Glass, Pioneer Roofing
Project Description: The sister 150,000-square-foot office buildings, each with +-50,000 square-foot floor plates, feature
dramatic three-story skylit lobby atriums with contemporary finishes and sculptural staircases, as well as open workspaces with high ceilings and an abundance of natural lighting. A shared outdoor space between the two buildings includes a covered patio and barista coffee bar, a sunken patio and scattered benches for employee enjoyment, and artificial turf areas ideal for lawn games.
Buckeye85
Developer: Lincoln Property Company
General Contractor: Layton Construction
Architect: Butler Design Group
Location: SW corner of 103rd Avenue and Buckeye Road, Buckeye
Size: 321,873 SF
Brokerage Firm: Lincoln Property Company
Value: $65 million
Start/Completion: 4/2021-12/2021
Subcontractors: AME, Hardrock, Desert Structures
Project Description: Midsize industrial users will enjoy amenities often found only in the largest industrial projects, including a 36-foot clear height, full concrete truck courts, a 94-door cross-dock configuration and state-of-the-art freezer/cooler capabilities, as well as touchless technology throughout, generous use of clerestory windows and an employee-centric outdoor amenity space. The Class A location supports omichannel users, successfully positioning them near clusters of suppliers, manufacturers and warehouses.
Central Logistics Center
Developer: ViaWest Group
General Contractor: Nitti Builders
Architect: Deutsch Architecture Group
Location: 111 E. Buckeye Road, Phoenix
Size: 439,000 SF
Brokerage Firm: CBRE
Start/Completion: Q1/2021-Q4/2021
Project Description: The project includes more than 12-acres of vacant, developable land; a fully leased 30-foot clear height, 196,672-square-foot cross-dock warehouse; and a 76,301-square-foot freezer storage facility that underwent a floor-to-ceiling renovation, including an upgraded state-of-the-art freon system. New construction consists of a 32-foot clear height, 94,146-square-foot Class A industrial building, and a 71,555-square-foot industrial warehouse adjacent to the cold-storage facility.
Chandler Corporate Center, Phase II
Developer: VanTrust Real Estate
General Contractor: Stevens-Leinweber
Architect: Butler Design Group
Location: 4100 W. Chandler Blvd., Chandler
Size: 118,000 SF
Brokerage Firm: JLL
Start/Completion: 1/2020-1/2021
Subcontractors: Stone Cold Masonry, Spectrum Mechanical, Aero Automatic Fire Protection, Bell Steel, Progressive Roofing, Riggs Contracting, ABCO West Electrical
Project Description: Chandler Corporate Center is a 26-acre office and retail development positioned just
1 mile west of the Loop 101. Phase 1 included a spec-built 118,000-square-foot office building that was leased to Allstate. Phase 2 is a spec-built “sister” building. Future phases will include retail and additional office.
Chandler Crossroads
Developer: ViaWest Group
General Contractor: Willmeng Construction
Architect: Deutsch Architecture Group
Location: 2800 S. Gilbert Road, Chandler
Size: 116,083 SF
Brokerage Firm: Lee & Associates
Start/Completion: 10/2021-Q3/2022
Project Description: This new building, with a fenced truck court that is screened from the road, will feature a 30-foot clear height, clerestory windows and outdoor common area patio space. The front elevation has been dressed up to echo the appearance of an adjacent office product. The initial build-out will include one 2,396-square-foot spec suite of office, but the structure is divisible from 29,000 square feet to 116,000 square feet.
Converge Logistics Center
Developer: ViaWest Group
General Contractor: Willmeng Construction
Architect: Butler Design Group
Location: Interstate 10 and Chandler Boulevard
Size: 510,832 SF
Brokerage Firm: Cushman & Wakefield
Start/Completion: Q3/2021-Q2/2022
Project Description: ViaWest Group has a 77-year ground lease with Kyrene School District on 28.6 acres on which it will develop the Converge Logistics Center. The project will consist of three general industrial buildings with interstate visibility. The multitenant buildings feature divisibility to 23,500, 39,800 and 52,000 square feet; 32-foot clear heights; and a combination of dock-high and grade-level doors.
DoorDash
Developer: Lincoln Property Company
General Contractor: Holder Construction
Architect: McCarthy Nordburg
Location: 1033 W. Roosevelt Way, Tempe
Size: 197,500 SF (Phases 1-2)
Brokerage Firm: Cushman & Wakefield
Value: $17,775,000
Start/Completion: 7/2019-6/2021 (Phases 1-2)
Subcontractors: Energy Systems Design, AZ Restaurant Supply, Airpark Signs
Project Description: The main objective was to design a dynamic new office that supports the organizational needs of DoorDash and represents its brand and culture. The Grand 2 provided the ideal location, and DoorDash will occupy the entire nine-story building. Broken into sales and support floors, the office includes a reception on the first floor, a variety of collaboration and meeting spaces, a technology bar, training rooms and two large break rooms that support catered food. Polished concrete floors, exposed concrete columns and wood ceiling details reinforce the company’s focus on natural materials.
Goodyear Crossing Industrial Park
Developer: ViaWest Group
General Contractor: Willmeng Construction
Architect: McCall & Associates
Location: 165520 W. Commerce Drive, Goodyear
Size: 411,026 SF
Brokerage Firm: Lee & Associates
Value: $20.9 million
Start/Completion: 2/2021-9/2021
Subcontractors: Hawkins Design Group, Mechanical Designs, Riggs Companies, Bell Steel, Panelized Roof Structures, Global Roofing, Summit Fire Protection, AE Concrete, ELS Landscaping
Project Description: This project, located in a Qualified Federal Opportunity Zone, comprises three buildings designed for office, warehouse and light industrial uses. Each is constructed with concrete tilt-up walls, storefront glazing, and metal trellises with flat, wood panelized roofing systems. The largest building, at 284,107 square feet, will feature a 36-foot clear height cross-dock design, while the smaller two will be front-loaded with
28-foot clear heights.
Gatorade/Pepsi Distribution
Developer: Merit Partners
General Contractor: Stevens-Leinweber
Architect: Butler Design Group
Location: NCW 75th Avenue and Buckeye Road, Tolleson
Size: 750,000 SF
Brokerage Firm: CBRE
Start/Completion: 3/2021-2/2022
Subcontractors: Suntec Concrete, Integrity Electric, Pro-Low
Project Description: The new warehouse and distribution center will more than double the beverage company’s Metro Phoenix industrial footprint. Building features include 40-foot clear heights, cross-dock loading and generous power. The project is 1.5 miles from I-10 and served by a full-diamond interchange at 75th Avenue.
GSQ Goodyear
Developer: Globe Corporation
General Contractor: Ryan Companies
Architect: Butler Design Group
Location: 15150 W. Park Place & 1860 N. Civic Square, Goodyear
Size: 228,629 SF
Brokerage Firm: CBRE
Value: $125 million
Start/Completion: 4/2021-6/2022
Project Description: GSQ introduces a modern, forward-thinking city hall destination designed to grow with Goodyear. The project features a two-acre civic park surrounded by Class A office building Gen1, a four-level parking structure, library and Goodyear’s city hall.
KeHE Distributors
Build-to-Suit
Developer: Becknell Industrial
General Contractor: Becknell Industrial
Architect: Ware Malcomb
Location: 17510 W. Thomas Road, Goodyear
Size: 468,182 SF
Brokerage Firm: Colliers International
Value: $68 million
Start/Completion: 10/2020-9/2021
Subcontractors: AAA Landscape, ABS Floor Covering, ALTA Refrigeration, D.H. Pace, Delta Diversified Enterprises, Diamond Painting, FE Moran, FREEZ Construction, HACI Mechanical Contractors, Indiana Steel Fabricating, Integrated Masonry, Lazzaro Companies, Performance Contracting Inc., Precision Glass & Aluminum, Roofing Southwest, Scott’s Diversified Construction, Suntec Concrete, Systems LLC, Western Fence, Western Underground
Project Description: Specialty food provider KeHE Distributors is growing its national footprint into the greater Phoenix market. This state-of-the-art tri-temp facility, which is expandable by 150,000 square feet, contains freezer, cooler and dry storage space.
Lotus Project Phase II
Developer: Conor Commercial Real Estate
General Contractor: McShane Construction Company
Architect: DLR Group
Location: 6575/6636/6685 W. Frye Road, Chandler
Size: 292,098 SF
Brokerage Firm: CBRE
Value: $45 million
Start/Completion: 1/2021-12/2021
Subcontractors: Suntec, Structures Group, Pueblo Mechanical & Controls, Denny Clark Masonry, RMJ Electric, Ikon Steel, Specialty Roofing, Redpoint Contracting
Project Description: This centrally located Class A industrial project with prominent Loop 202 freeway frontage consists of three highly visible industrial building designed for manufacturing, research and development, and technology-centric users. Buildings 5 (144,321 square feet) and 6 (106,875 square feet) will feature 32-foot clear heights, while building 7 (48,786 square feet) offers a 28-foot clear height. All will include dock-high and grade-level doors, ample parking and elevated design elements.
Mesa Hangars at Falcon Field Phase 1
Developer: Davcon Companies/Mesa Hangar/Davcon Aviation
General Contractor: GCON Inc.
Architect: ADM Group
Location: 2559 N. Greenfield Road, Mesa
Size: 400,000 SF
Brokerage Firm: Leading Edge Real Estate
Value: $56 million
Start/Completion: 5/2020-7/2021
Subcontractors: Arizona Corporate Builders, Riggs Concrete, RMJ, Wall Assemblies, Aspen Interiors, Pueblo Mechanical, Iron Horse, Markham, Carters, Aero, Amber Steel, Arizona Glass and Glazing, Envision, Otis, Recreate, Progressive Roofing, Premier Underground, Reiber, Integra Engineering, Sportsmans Concrete
Project Description: This new aviation development in an Opportunity Zone consists of office space mixed-use hangars that can accommodate various aircraft types, including large business jets and helicopters. Proposed uses for the S-1 occupancy hangars include FBO operations, corporate aircraft storage, helicopter operations, aircraft maintenance, light aviation manufacturing and assembly, and aerospace industry.
New Square Chandler
Developer: Spike Lawrence Ventures/HCW
General Contractor: Layton Construction/Crossland (Hilton Garden Inn)
Architect: Whitneybell Perry
Location: 130/150/180 S. Arizona Ave., Chandler
Size: 129,000 SF
Brokerage Firm: Cushman & Wakefield
Value: $36 million
Start/Completion: 11/2019-12/2020
Subcontractors: Progressive Roofing, ResComm Plumbing, BTS Heating and Air, Clayton Flooring, Integrity Electric, Aspen Technology, Precision Glass, European Pavers, Concrete Finishing Professionals, Sigler Controls, Schindler Elevators
Project Description: This multiuse commercial/Class A office development in historic downtown Chandler brings an impressive list of popular eateries, including
DC Steak House, The Stillery and JINYA Ramen Bar, and such notable companies as Great Western Bank and WellSky to the area. The center courtyard stage is equipped with lighting and state-of-the-art sound for concerts and events. The project also includes a 111-room Hilton Garden Inn, and Phase 2 will add luxury multifamily residential.
Ortho AZ
General Contractor: LGE Design Build
Architect: LGE Design Group
Location: 8405 N. Pima Center Parkway, Scottsdale
Size: 50,000 SF
Value: $14.3 million
Start/Completion: Q1/2020-Q1/2021
Subcontractors: Rosendin Electric, Re-Create Masonry, Ace Asphalt, Arc Steel, Milam Glass
Project Description: The two-story workspace is the largest medical office building in the area. It features a surgery center and onsite imaging services. The design is focused on improving efficiency and providing doctors and patients with a convenient and comfortable experience. The contemporary building showcases glass and concrete elements, allowing for plenty of natural light.
Park303 Phase II
Developer: Lincoln Property Company
General Contractor: Willmeng Construction
Architect: Butler Design Group
Location: Directly fronting the east side of Loop 303, with buildings spanning the north and south sides of Glendale Avenue
Size: 2.2 million SF
Brokerage Firm: Lincoln Property Company
Value: $400 million
Start/Completion: 9/2021-11/2022
Project Description: Phase II adds four new state-of-the-art industrial buildings to the 210-acre Park303 industrial park. In addition to
Class A building features, Phase II includes a health- and wellness-focused outdoor space with sports courts, game areas and shaded dining and barbeque stations for a best-in-class tenant experience. Building amenities include a 40-foot clear height, steel moment frame shear bracing, oversized clerestory windows on all elevations, generous power, ESFR sprinklers, 25-foot-tall glass entries and touchless technology throughout. The site is Foreign Trade Zone capable.
Park Central Retail and Restaurants
DEVELOPER: Plaza Companies
Architect: Butler Design Group
Location: 3112 N. Central Ave., Phoenix
Size: 6,500 SF
Brokerage Firm: Plaza Companies/Cushman & Wakefield
Value: $3.2 million
Start/Completion: Q4/2021-Q2/2022
Project Description: The new restaurant and retail buildings will be home to three significant hospitality tenants: Poolboy, a concept to be named later, and a relocated Starbucks with drive-thru access. A midcentury modern design complements the overall aesthetic of the revitalized Park Central development.
Park Lucero East
DEVELOPER: Artis REIT
General Contractor: Willmeng Construction
Architect: Butler Design Group
Location: 410/430/450 E. Germann Road, Gilbert
Size: 562,920 SF
Brokerage Firm: JLL
Value: $60 million
Start/Completion: Q1/2021-Q2/2022
Subcontractors: Kearney Electric, Summit Fire Protection, Universal Piping, Riggs Concrete, Atlas Masonry, Progressive Roofing, Pro-Low Joint Venture
Project Description: This Class A industrial development consists of three buildings along the south Loop 202 with 202 and Germann Road frontage. A joint venture partnership between Artis REIT and Nuveen Real Estate, it is located adjacent to Park Lucero, a multiphase industrial complex.
PLC Two
Developer: Merit Partners
General Contractor: Stevens-Leinweber
Architect: Ware Malcomb
Location: 1515 S. 91st Ave., Phoenix
Size: 481,600 SF
Brokerage Firm: JLL
Start/Completion: 12/2020-10/2021
Subcontractors: RMJ Electrical, Riggs Companies, Panelized Structures
Project Description: The fully speculative PLC Two is designed for major manufacturing use. Amenities include a 40-foot clear height and generous dock doors, and auto and trailer parking, with all of the efficiencies needed to operate a state-of-the-art warehouse, distribution or manufacturing operation. The building is less than 3 miles from a full-diamond I-10 interchange, less than 30 minutes from Sky Harbor Airport and within a 30-minute drive to 1.9+ million residents.
Project 201: PHX Reimagined
(Talking Stick Resort Arena Renovations)
Developer: Phoenix Arena Development Limited Partnership
General Contractor: Okland Construction
Architect: Hellmuth, Obata & Kassabaum (HOK)
Location: 201 E. Jefferson St., Phoenix
Size: 15,000 SF
Value: $10 million
Start/Completion: 8/2019-8/2021
Subcontractors: Comfort Systems USA Southwest, Climatec, Preferred, Able Balance
Project Description: The Talking Stick Arena renovations enhance the fan experience by creating a modern, open environment with areas that will be used to socialize and enjoy the game experience. Behind-the-scenes infrastructure upgrades, such as HVAC, keep guest comfort in mind. The heart of the arena cooling system was overhauled, including installation of three 1,200-ton Carrier Chillers to maximize efficiency and allow the arena to cut-over to a self-sustaining cooling system.
SOLLiD Cabinetry
General Contractor: LGE Design Build
Architect: LGE Design Group
Location: 2615 E. Germann Road, Chandler
Size: 251,000 SF
Value: $25.1 million
Start/Completion: 4/2020-8/2021
Subcontractors: Phoenix Commercial Electric, Hardrock Concrete, TriMega Mech Heating & AC, Sharp Creek Contracting,
Jonic Glass
Project Description: This custom cabinetry office, warehouse and manufacturing facility, which is situated on 17 acres, features 50,000 square feet of Class A office space; an expansive two-story lobby with lush finishes; and manufacturing equipment imported from around the world. Equally as impressive is the 4,600-square-foot dust control system from Germany that is enclosed in its own yard and screened with two-story structural steel and a perforated metal skin.
The Grove
DEVELOPER: RED Development
General Contractor: Okland Construction
Architect: Nelsen Partners
Location: 4300 E. Camelback Road, Phoenix
Size: 750,000 SF
Brokerage Firm: JLL/RED Development
Value: $300 million
Start/Completion: 3/2021-Q3/2022
Subcontractors: Suntec Concrete,
Blount, Levake, Sun Valley Masonry,
Cutting Edge Fabrication, Progressive Roofing, Airpark Signs, Otis, Irontree Plumbing, Comfort Systems Southwest,
JFK Electic, AME Landscape
Project Description: This creative, sophisticated mixed-use campus features 180,000+ square feet of Class AA office space, a boutique hotel by restauranteur Sam Fox, luxury residences and unique upscale dining and retail venues. Guest and tenant perks include VIP valet service, lavish amenities and breathtaking views of Camelback Mountain. The Grove is also home to the new state-of-the-art Phoenix Suns & Mercury training facility.
Tolleson 107 Logistics Center
Developer: Trammell Crow Arizona Development Inc.
General Contractor: Wespac Construction
Architect: Butler Design Group
Location: 10601 W. Van Buren St., Tolleson
Size: 332,160 SF
Brokerage Firm: Cushman & Wakefield
Value: $16,204,177
Start/Completion: 5/2021-1/2022
Subcontractors: DP Electric, Ryan Mechanical, Integrated Masonry, S&S, Riggs, Progressive Roofing
Project Description: This large-scale Class A industrial project comprises logistics and retail space. The cross-dock facility will feature 36-foot clear height, concrete truck courts, four points of access, 52-by-52-foot column spacing with 60-foot speed bays, 266 car parking stalls, 54 trailer parking stalls, 78 dock-high positions, and four grade-level doors.
VA Outpatient Center
Developer: Phoenix VA LLC
General Contractor: Jacobsen Construction Company
Architect: Hoefer Welker
Location: 400 N. 32nd St., Phoenix
Size: 281,543 SF
Value: $95 million
Start/Completion: Q1/2019-Q4/2021
Subcontractors: Graef Construction, Suntec Concrete, Cives Steel Company, TPAC, Harris, Complete Fire Protection, Rosendin Electric, Southwest Integrated Solutions, Pete King Construction, Wholesale Flooring, Stone Finish, Western Millwork, Western Acoustics, DH Pace, Gen3, Walters & Wolf, Sun Valley Masonry, Progressive Roofing, Schindler Elevator, Sunland Asphalt, Keystone Concrete, Chacon Landscaping
Project Description: This Veterans Affairs clinic will offer patients primary care, mental health treatment, radiology services, OB-GYN care, pharmacy services and more, ensuring the best possible care for those who have selflessly served their country. An open office bullpen configuration will enhance collaboration and communication in support of the VA’s Patient-Aligned Care Teams initiative. This facility will be one of the VA’s largest and busiest clinics, taking more than 500,000 patient visits annually in 360 exam and consult rooms.
VT 303 Building 2
DEVELOPER: VanTrust Real Estate
General Contractor: Layton Construction
Architect: HPA Architects
Location: 6390 N. Alsup Avenue, Glendale
Size: 542,974 SF
Brokerage Firm: Cushman & Wakefield
Start/Completion: 4/2021-12/2021
Subcontractors: Suntec, Gunsight, Castle Steel, Olympic West Fire Protection, Panelized Structures, Ricor, Progressive Roofing, Tekstar, AME Electrical
Project Description: VT 303 Building 2 is a cross-dock structure with a 40-foot clear height, 409 automobile spaces, 216 trailer parking spaces and multiple points of ingress and egress by way of Sarival Road and Alsup Avenue.
VT Tucson
DEVELOPER: VanTrust Real Estate
General Contractor: Catamount Constructors
Architect: HPA Architects
Location: 3550 E. Corona Road, Tucson
Size: 278,670 SF
Brokerage Firm: Cushman & Wakefield/PICOR
Start/Completion: 1/2021-8/2021
Subcontractors: Markham Contracting, Central AZ Civil Construction, Suntec Concrete, Global Roofing SW, Olympic West Fire, JAX Refrigeration, Sturgeon Electric
Project Description: This cross-dock build-to-suit, situated on 46 acres, features a 36-foot clear height, 454 automobile parking stalls and 392 trailer stalls. Constructed in fewer than eight months, it is VanTrust’s first project in Southern Arizona.